Commercial demolition cost is considered to be the primary factor for businesses that are planning to rebuild or renovate their establishment. Statistics reveal that the average cost for demolishing  a 5000 square feet commercial area costs something between $4 and $8 per square foot and the price goes up to $ 25 when the area is larger. However, we are here to talk about another important factor that determines the actual pricing. Whether it is an empty building or one that is occupied? Additional responsibilities come when the building is already occupied and hence influence the competitive commercial demolition cost.

Complexity of occupied building demolition

Careful scheduling is very important before occupied commercial building demolition. Commercial tenant demolition, i.e. tenant coordination and marking restricted work zones is a part of the careful scheduling. An active building needs continuous access to offices, shops or shared facilities. Experienced contractors providing commercial demolition tsawwassen  plan according to business hours, emergency exits and operational requirements carefully. The overall commercial building cost is thus directly influenced.

Additional safety and protection measures that affect the cost

When a building is operating while the demolition process is going on, there needs to be protective barriers, secured work zones and temporary partitions. Selective demolition contractors need to isolate utilities.  Accidents can be prevented through these measures while the interior commercial demolition works are in progress. Putting all these factors together in the right way clearly increases the overall cost of the demolition work.

Influence on price: Noise and vibration factors

Implementing effective demolition dust control does not come for free. Contractors may need to use specialized equipment to reduce the noise and that is expensive as well. They also need to use monitor vibration, i.e. require additional equipment and labour planning. The cost of operational building demolition in Vancouver depends primarily on the mentioned factors and must not be considered to be cheap.

Shared elevators, corridors and loading area: Important factors to consider

Transportation of demolition debris requires enough access space, which is often limited in an operational building. Factors like shared elevators, corridors and loading docks require to have reserved time slots and this actually delays the entire demolition process. The final result is an increase in demolition cost.

Phased demolition or work at once?

Phased demolition costs are higher as work zones have to be established repeatedly. When the work is done at a time, the cost of industrial demolition becomes a bit less. However, the least expensive demolition process may not be the most effective one.

Risk and cost matrix

CostVacant buildingOccupied building
ContainmentBasic site protectionBarriers, dust control
Working hoursFlexible schedulingRestricted
Access routesDedicated movement routesShared corridors
Tenant coordinationMinimalRegular communication

Need to know what to be included while planning demolition of an occupied commercial building? Make sure to have a detailed site inspection, prepare a tenant communication strategy, isolate the utilities, prepare waste removal schedules – and you will surely experience a hassle-free demolition.

FAQs

How much does it cost to demolish a 10,000 square feet commercial building?

    The cost will be between $8 and $12 per square foot.

    Can residential demolition contractors handle commercial buildings?

    Some of them may do it, but it is better to hire specialized contractors.

    Will I have to uninstall the electric supply before demolition?

    Yes, it is necessary.